Debenhams

Kelvenix

Long Lead Built-In LED Flashlight Pet Lead

£48.99£52.99Save 8%
Colour: Black
Premier Logo
Enjoy unlimited delivery for an entire year from just £14.99
Debenhams Shipping Insurance Logo
Peace of mind, guaranteed
Free & simple resale - recover value and give your items a second life
+14-day return extension
£5/day late delivery compensation
Full order coverage (lost, stolen, damaged) with instant payout on eligible claims
Learn More

“Refund was approved and back in my account the same day.” - Deliver+ customer

Sold & Delivered by Roxlin Direct
Exclusions apply. See more
Delivery Only 99p On This Product
Standard Delivery in 3-5 working days
Eligible for return within 21 days. Plus 14-day extension when you purchase Debenhams Deliver+Exclusions apply. Please see our returns policy
paypal Iconclearpay Icondebenhams Icondebenhams Icon
18+, T&C apply. Credit subject to status.
See more
At a Glance
Dual leash for two dogs
Built-in rechargeable LED flashlight
360° anti-tangle rotation mechanism
Independent brake buttons each leash
Durable nylon braided ropes
Description

Dual leash design: Suitable for walking two small dogs simultaneously, with a maximum weight capacity of 10 kg per dog, providing a safe activity space. Lightweight and durable: Made with high-quality ABS plastic housing, Lightweight, paired with sturdy nylon braided ropes for daily use. 360° anti-tangle design: Independent rotation mechanism ensures the two leashes do not tangle; each leash is equipped with an independent brake button for easy control. Built-in LED flashlight: Features a rechargeable LED flashlight with , ideal for nighttime dog walking.

SKU: M8581764301609
Product Details & Care

Battery capacity: 500mAh Voltage: 3.7V Suitable pet size: small dogs (maximum 10kg per dog) Leash length: 3m Material: nylon Color: khaki Function: LED flashlight Package Contents: Retractable pet leash x1 Roll of garage bags x1 Charging cable x1

Delivery

Free Delivery For A Year With Unlimited Delivery

Super Saver Delivery

£2.99

99p on orders over £30

Standard Delivery

£3.99

Express Delivery

£5.99

Next Day Delivery

£6.99

Order before Midnight

24/7 InPost Locker | Shop Collect

£2.49

Evri ParcelShop

£3.99

Evri ParcelShop | Next Day Delivery

£5.99

Premium DPD Next Day Delivery

£6.99

Order before 9pm Sunday - Friday and before 8pm Saturday

Bulky Item Delivery

£4.99

Northern Ireland Super Saver Delivery

£2.99

Northern Ireland Standard Delivery

£4.99

Northern Ireland Express Delivery

£5.99

Order before 7pm Sunday - Thursday (Delivery Monday - Saturday)

Unlimited Delivery

£10

Free Delivery For A Year. Was £14.99, Now £10 For A Limited Time Only.

Find Out More

Please note, some delivery methods are not available for products delivered by our brand partners & they may have longer delivery times.

Find out more

Returns

Something not quite right? You have 21 days from the day you receive it, to send something back. When you purchase Debenhams Deliver+, you will have an extra 14 days on top of our standard 21-day window to initate a return.

Please note, we cannot offer refunds on fashion face masks, cosmetics, pierced jewellery, adult toys, and swimwear or lingerie if the hygiene seal is not in place or has been broken.

Items of footwear and/or clothing must be unworn and unwashed with the original labels attached. Also, footwear must be tried on indoors. Items of homeware including bedlinen, mattresses, and toppers, and pillows must be unused and in their original unopened packaging. This does not affect your statutory rights.

Click here to view our full Returns Policy.

We Think You'll Like

Sponsored Products